Call Us Tel: +603-3345 2900

Dynoptic Smoke Opacity

Installation 2 units of Dynoptic Smoke Opacity and Density for boiler ductig at GF 1, Kapar Energy Venture.

12

Installation of the Opacity Panel

7

Installation of the Opacity Panel

 

 

 

 

 

5

Installation of Opacity display

1

Installation the Dynoptic opacity scanner to the welded flange at both side of boiler ducting