Call Us Tel: +603-3345 2900

Archive for the Project Gallery Category

Rapid Pengerang – REXA Actuator Installation

Promecon- PromeCOAL

REXA Actuator Installation

PETRONAS Gas Processing Santong

Project : Williamson Flare Pilot Monitoring Optical Sensors

 

 

Flowserve Training

Flowserve Training (22-23 April 2019)

Williamson Rep Sales (Asia Pacific Edition 2019)

Sultan Salahuddin Abdul Aziz Power Station

Installation of REXA Actuator at Turbine Lube Oil Cooler Unit 2

1

Existing pneumatic actuator attached to TLOC control valve

2

REXA electronic control panel installed

2

REXA electronic control panel installed

 

 

 

 

 

 

 

 

3a

REXA actuator junction box installed

3b

REXA actuator junction box installed

4

New REXA actuator installed to TLOC control valve

REXA ACTUATOR

 

Installation of Rexa actuator at Turbine Lube Oil at unit 2

1

Existing pneumatic actuator attached to TLOC control valve

2a

REXA electronic control panel installed

2b

REXA electronic control panel installed

 

 

 

 

 

 

 

 

 

 

3a

REXA actuator junction box installed

3b

REXA actuator junction box installed

4

New REXA actuator installed to TLOC control valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation of REXA actuator

olympus-digital-camera-3-2

The original equipment of GR pneumatic actuator

CONVERSION GR FAN PNEUMATIC ACTUATOR TO GR FAN REXA ACTUATOR

After installation of REXA actuator for GR fan

CONVERSION GR FAN PNEUMATIC ACTUATOR TO GR FAN REXA ACTUATOR

Another view of REXA actuator after installation

E-one Hydrogen Analyzer

Installation of E-One hydrogen analyzer at Kapar Energy Venture (KEV).

KEV GF3 hydrogen cooled generator

E-One  hydrogen analyzer

 

 

 

 

 

 

 

 

 

 

KEV GF3 hydrogen cooled generator

E-One hydrogen analyzer control panel